Skip to main content
  • About Us
  • Key Staff
  • News
  • Contact Us

IcomScottech - Contact Electronics Manufacture

01573 226663
01573 228337
sales@icomscottech.com

Menu

Skip to content
  • Home
  • Electronics Manufacturing Services
    • Automated Optical Inspection
    • Component Procurement
    • PCB Assembly
    • Surface Mount Technology
    • Testing & Programming
  • LED Capabilities
  • Full Product Assembly
  • Quality

Amphenol expands cable-mount connectors

November 15, 2024
david manners

Amphenol RF has expanded its TNC product series to include additional configurations in both standard and reverse-polarity. These new cable-mount connector options are designed specifically to accommodate flexible micro-coaxial cable ...

The post Amphenol expands cable-mount connectors appeared first on Electronics Weekly.

Board adapts MIPI CSI cameras to Nvidia Jetson Orin

November 14, 2024
steve bush

Microchip has introduced a board that adapts MIPI CSI based cameras to Nvidia’s Holoscan ecosystem – its Jetson AGX Orin and IGX Orin developer kits in particular. The board, called ...

The post Board adapts MIPI CSI cameras to Nvidia Jetson Orin appeared first on Electronics Weekly.

Electronica: Micro-power Hall switch vies with automotive reed switches

November 14, 2024
steve bush

Melexis is aiming at replacing reed switches in automotive door door handles, sun visors, infotainment buttons and brake lights with a micro-power Hall effect switch. “For modern vehicles, accurate switch ...

The post Electronica: Micro-power Hall switch vies with automotive reed switches appeared first on Electronics Weekly.

Electronica: Exude thermal gap filler where you need it

November 14, 2024
steve bush

Chomerics announced a cure-in-place thermal gap filler material that remains flexible after curing, at Elecronica today. CIP 60 offers 6W/mK conductivity, and cures to a Shore hardness of 50 (ASTM ...

The post Electronica: Exude thermal gap filler where you need it appeared first on Electronics Weekly.

Electronica: Building automation mesh network over LoRa

November 14, 2024
steve bush

NeoCortec and Embit revealed bi-directional wireless mesh networking using LoRa modulation at Electronica in Munich yesterday. “The various wireless connectivity technologies all exist because they all address different challenges,” said ...

The post Electronica: Building automation mesh network over LoRa appeared first on Electronics Weekly.

Electronica: Source measurement unit tests 2D and nano devices to 1nA 3nV

November 14, 2024
steve bush

Lake Shore Cryotronics is aiming at the characterisation of 2D and nano electronic devices with a source measure unit capable of resolving 3nV and 1fA. A source measurement unit is ...

The post Electronica: Source measurement unit tests 2D and nano devices to 1nA 3nV appeared first on Electronics Weekly.

Electronica: AI-assistance supports new engineer experiences

November 14, 2024
Caroline Hayes

Siemens adds AI capabilities to unite “the design experience” across its tools portfolio. In an attempt to accelerate digital design, while dealing with constraints and resilience, Siemens has brought together ...

The post Electronica: AI-assistance supports new engineer experiences appeared first on Electronics Weekly.

AMD to cut staff by 4%

November 14, 2024
david manners

AMD is to lay off  1000 people representing 4% of its 26,000 worldwide employees as it focusses on its biggest market – AI ICs. AMD’s  Q3  saw revenue up 18% ...

The post AMD to cut staff by 4% appeared first on Electronics Weekly.

RAN market declines for sixth consecutive year

November 14, 2024
david manners

The RAN market—including baseband plus radio hardware and software, excluding services—declined in 3Q24, marking a sixth consecutive quarter of y-o-y revenue decline, says a report from Dell’Oro Group “Tougher comparisons, ...

The post RAN market declines for sixth consecutive year appeared first on Electronics Weekly.

AI datacentres will need 160% more electricity by 2027

November 14, 2024
david manners

Driven by AI requirements, datacentres will need 160% more electricity in the next two years, says Gartner. Gartner estimates the power required to run incremental AI-optimised servers will reach 500 ...

The post AI datacentres will need 160% more electricity by 2027 appeared first on Electronics Weekly.

Post navigation

  • Previous
  • 1
  • …
  • 67
  • 68
  • 69
  • 70
  • 71
  • …
  • 1,389
  • Next

Recent Posts

  • Infineon wins Rivian traction inverter power module deal
  • Micro-LED display with all-over photodetection
  • Sponsored Content: Automotive Waterproof Connectors Engineered for Harsh Environments
  • Onward and upward for Nvidia
  • Growth returns to RAN market in Q1 after two years of deck
May 2025
M T W T F S S
« Apr    
 1234
567891011
12131415161718
19202122232425
262728293031  

Contact

Icom Scottech Ltd
Sprouston Road
Kelso
Roxburghshire
Scotland
TD5 8EU

01573 226663
01573 228337
sales@icomscottech.com

Contact Us

Leave your information if you would like us to get in touch.

Connect

UKAS Quality Management SGS System Certification

©2025 Icom Scottech Ltd.
First4Websites